• WJOL on Air
    • Local News
    • Prize Vault
    • WJOL Live
    • WJOL Podcast
    • WJOL Podcast Archives
    • WJOL Photos
    • Prize Claim Form
    • Community Event
    • Submit a Community Event
    • Public Service Announcement Request
    • Careers
      • AlphaMedia Careers
      • Chicago Jobs
    • Contest Rules
      • 1340 WJOL Bracket Mania Rules
    • Contact
      • Facebook
      • Twitter
      • Soundcloud
      • YouTube
      • Alexa Skill
      • Radio.com
      • Tune In
      • iHeart Radio
    • Show Schedule
      Breaking News
Everything You Want To Know About COVID-19
Local News

Inspections scheduled on I-80 bridges over Des Plaines River

Apr 19, 2019 @ 5:14am

The Illinois Department of Transportation announced that regularly scheduled inspections of the Interstate 80 bridges over the Des Plaines River, in Joliet, will begin April 29, weather permitting.

Daily lane closures will be required, starting with the westbound bridge until May 6, when inspections begin on the eastbound bridge. Inspections on both bridges are expected to be complete by May 11, weather permitting.

The closures will take place between 8:30 a.m. and 2:30 p.m., Monday through Thursday and Saturdays, if necessary. A minimum of two lanes will remain open while inspections are taking place.

Motorists can expect delays and should allow extra time for trips through this area. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and remain alert for workers and equipment.

The inspections are being done in conjunction with an upcoming yearlong maintenance project on both bridges. Any additional issues discovered during the inspections will be addressed once construction begins in the field later this summer.

The larger project, currently under contract, involves steel repairs and bearing replacements. The process for fabricating new parts as already begun, with work on the bridges expected to start in June or July. The repairs will be taking place under both structures, with any necessary lane closures scheduled at night to avoid disrupting traffic during the daytime hours.

The project will be finished next summer.

Popular Posts
Joliet Turns Mini-Hollywood This Week
WJOL Host Lynne Lichtenauer Passes Away
Police Investigate Murder In Elwood
Joliet West Vaccination Clinic Closed For Third Straight Day Link To Will County Partner Vaccine Sites
Will County Health Department Partners With Pharmacies To Vaccinate Residents
Recent Posts
Cuomo Accuser Blasts Attempted Apology, ‘Predatory Behavior’
3 hours ago
Joliet Public Library to Cancel Star Wars Day for 2021
10 hours ago
Tractor Trailer Rollover on Interstate 80 Leads to Delays
11 hours ago
  • Careers
  • Our Stations
  • About Us
  • Advertise With Us
  • Contact Us
  • Privacy Policy
  • Terms Of Use
  • Accessibility Statement
  • Contest Rules
  • EEO Report
  • WJOL Public Inspection File
  • FCC Applications

© 2021 Alpha Media LLC.
All Rights Reserved.

Will County's News, Talk, Sports
  • WJOL on Air
  • Local News
  • Prize Vault
  • WJOL Live
  • WJOL Podcast
  • WJOL Podcast Archives
  • WJOL Photos
  • Prize Claim Form
  • Community Event
  • Submit a Community Event
  • Public Service Announcement Request
  • Careers
    • AlphaMedia Careers
    • Chicago Jobs
  • Contest Rules
    • 1340 WJOL Bracket Mania Rules
  • Contact
  • Show Schedule
CONNECT WITH US
LISTEN TO US ON